ADU Rules in Bainbridge Island, WA (2026): What Your Lot Allows

Rendering of The Blakely, an 800 sq ft two-story cedar-shingle ADU from the Bainbridge Island Pre-Approved ADU plans
The Blakely, one of the countywide Pre-Approved ADU plans offered by the City of Bainbridge Island. Rendering: City of Bainbridge Island Pre-Approved ADU program.

Bainbridge Island allows one accessory dwelling unit (ADU) per parcel in every residential zone, attached or detached, up to 1,000 square feet. It needs one extra off-street parking space and must meet the zone’s setbacks and lot coverage. An ADU cannot be used as a short-term rental unless the city approves a business license for that use.

Those are the rules in Bainbridge Island Municipal Code (BIMC) 18.09.030.I.5 as the city publishes them in 2026. This guide walks through each rule, the 2025 changes, the countywide Pre-Approved ADU plans and what Washington’s ADU law adds. When you are ready to draw, our page on ADU design on Bainbridge Island covers how we design one for your lot.

Bainbridge Island ADU rules at a glance (2026)

The whole island is one city, so every parcel follows the city’s code, not Kitsap County’s. This is the table that matters for a Bainbridge lot.

StandardBainbridge Island rule (BIMC 18.09.030.I.5)
Where allowedAll residential zones, within or detached from a new or existing single-family home
Number per parcelOne ADU, attached or detached
Maximum size1,000 square feet; an attached garage and stairs enclosed inside the walls do not count
Setbacks and lot coverageThe zone’s standards; a variance can reduce setbacks up to 50 percent for a one-story ADU
ParkingOne off-street space in addition to the main home’s
Short-term rentalNot allowed unless an approved business license is obtained for that use
Shoreline lotsA conditional use under BIMC 16.12
Winslow (Mixed Use Town Center)New ADUs only within an approved housing design demonstration project

Source: City of Bainbridge Island, Accessory Dwelling Units flyer, and the ADU section as reprinted in the city’s Title 18 hearing draft of May 14, 2026. The municipal code controls, so confirm the current text with Planning & Community Development (PCD) before you design.

How many ADUs can you build on a Bainbridge Island lot?

One. The code says only one accessory dwelling unit may be created per parcel. It can sit inside the house, in a basement, over a garage or in a separate backyard cottage.

A detached ADU may not contain any other accessory use except a garage. A studio, workshop or gym in the same building would need its own separate structure.

Washington’s ADU law sets a higher floor inside urban growth areas, covered below. If a second unit matters to your plans, raise it with PCD early.

Size limits for a Bainbridge Island ADU

An ADU may contain 1,000 square feet of floor area or less. Three details change what that number means on a real plan:

  • Garages: when the ADU is built together with a garage, the garage’s square footage does not count toward the 1,000.
  • Stairs: stairs enclosed within the exterior walls of the building do not count toward the ADU’s floor area.
  • Existing buildings: an ADU inside a building that already existed when the 2015 ordinance was approved, such as a basement, may be allowed to be larger. The city can permit this so all of the floor area is used efficiently.

The ADU section sets no separate height figure. The zone’s own height and development standards apply, along with every other standard for the lot.

Setbacks, entrances and access

A detached ADU must meet all setback and lot coverage standards of its zone. Being small earns no automatic relief. The one release valve is a variance, available only for up to a 50 percent setback reduction, and only for one-story ADUs.

Two layout rules shape the first sketch:

  • Entrance: if an ADU inside the main home needs a separate outside entrance, it must be on the rear or side of the building.
  • Driveway: access should come from the same driveway or street frontage as the main home, unless site-specific constraints justify a different approach.

Parking, utilities and short-term rentals

  • Parking: one off-street space for the ADU, in addition to the main home’s parking. The city’s flyer notes an exception within 0.25 miles of a transit stop or where enough on-street parking exists.
  • Water and sewer: the ADU must connect to public sewer and water where available. A septic system needs approval from the Kitsap Public Health District.
  • Short-term rentals: an ADU cannot be used as a short-term rental, such as Airbnb, unless an approved business license is obtained for that use.
  • Recreational vehicles: an RV is never an ADU.

Shoreline and critical areas

Much of the island’s housing sits near water, and that changes the process. In the shoreline jurisdiction an ADU is a conditional use, so it goes through the shoreline conditional use process in BIMC 16.12.

The flyer adds that ADUs near streams, wetlands or geologically hazardous areas may face extra review and mitigation. The application must include information on critical and environmentally sensitive areas under BIMC 16.20. A feasibility study settles these questions on paper before design starts.

What changed in 2025 (Ordinance 2025-26)

City staff found that parts of the old ADU code blocked the use of the countywide pre-approved plan sets. The Council approved Ordinance 2025-26 on October 14, 2025, and it took effect on October 23, 2025, according to the city’s housing page.

The Bainbridge Island Review reported the main changes. The size cap rose from 900 to 1,000 square feet. A shared driveway is no longer required. One-story ADUs can sit closer to the road and the main home with planning approval. ADUs no longer have to look like part of a single-family home.

What Washington’s ADU law adds (RCW 36.70A.681)

In 2023 the Legislature passed House Bill 1337, now RCW 36.70A.681. Inside urban growth areas it sets limits on local ADU rules:

  1. At least two ADUs on every lot in a zone that allows single-family homes.
  2. No owner-occupancy requirement for the main house or the ADU.
  3. No maximum floor area below 1,000 square feet.
  4. No roof height limit below 24 feet, unless the main house is limited to less.
  5. Conversions of existing structures, including detached garages, must be allowed even if they break current setback or lot coverage rules.
  6. No off-street parking within one-half mile walking distance of a major transit stop.

Under RCW 36.70A.680, these rules apply only within urban growth areas. Where a city has not updated its code, they override conflicting local rules. They do not apply to lots designated with critical areas or their buffers. Bainbridge’s published code still says one ADU per parcel, so ask PCD in writing how the state rule applies to your parcel.

Bainbridge Island’s Pre-Approved ADU program

Bainbridge Island takes part in a countywide program led by the Kitsap Regional Coordinating Council, with Bremerton, Port Orchard and Poulsbo. The city’s Pre-Approved ADU page lists these models:

ModelSizeLayout
The Lille480 sq ftOne bedroom, one story
The Sidney600 sq ftOne bedroom, one story
The Sinclair800 sq ftTwo bedrooms, one story
The Blakely800 sq ftTwo bedrooms, two stories
The Kitsap672 or 834 sq ftOne bedroom over a two-car garage, or two bedrooms over a three-car garage
The Salish1,000 sq ftThree bedrooms, one story (pending final plan approval)

You choose a model and submit the city’s plan request form to get the full, stamped plan set. A pre-approved plan is not a pre-approved project. City staff still review every ADU for zoning, critical areas, shoreline designation and other land use rules. The city strongly encourages a call with PCD about site feasibility before you start.

The application itself needs a site plan to the city’s Site Plan Requirements, a scaled floor plan showing both homes’ square footage, elevations, and proof of water and sewer or septic capacity. The full sequence is in our Bainbridge Island building permit guide.

Pre-approved plan or custom ADU design?

You are not required to use a pre-approved plan. In our experience as an ADU design studio, the lot decides it, not the plan.

Your situationBetter fit
Flat, open yard where a standard footprint fits the setbacksPre-approved plan
Wooded or sloped lot, water views, or a wetland or stream bufferCustom design around the trees, slope and buffer
Shoreline lot needing a conditional use reviewCustom design planned for the shoreline review
Converting a basement, garage or existing buildingCustom design; the model plans assume new construction
A model plan is close but needs a different entry or window wallArchitect-adapted plan under standard review

How Bluefoot designs an ADU for Bainbridge Island

Bluefoot Architecture & Design works from a studio on Front Street in Poulsbo, across the Agate Pass Bridge, serving Kitsap County. Principal Architect Jay Volz and interior designer Michele Doyle bring more than 40 years of combined experience. The studio was named Best Architect in the 2026 Best of Kitsap awards. Every ADU starts with a lot analysis and zoning review confirmed with PCD, then moves through design, interiors and permit documents to construction support.

Comparing towns? Read our Poulsbo ADU rules guide, or the Kitsap County ADU guide for unincorporated lots.

Frequently Asked Questions

How many ADUs can I have on Bainbridge Island?

One per parcel under BIMC 18.09.030.I.5, attached or detached. State law requires at least two inside urban growth areas, so ask Planning & Community Development how that applies to your parcel before you plan a second unit.

How big can an ADU be on Bainbridge Island?

Up to 1,000 square feet. An attached garage and stairs enclosed within the walls do not count. An ADU inside a building that existed before the 2015 ordinance, such as a basement, may be allowed to be larger.

Can I rent my Bainbridge Island ADU on Airbnb?

Not without approval. The city’s ADU flyer says an ADU cannot be used as a short-term rental unless an approved business license is obtained for that use.

Can I build an ADU on a Bainbridge Island waterfront lot?

Often, but in the shoreline jurisdiction an ADU is a conditional use under BIMC 16.12. Expect shoreline review and possibly critical-area reports before a building permit is issued.

Do pre-approved ADU plans skip city review on Bainbridge Island?

No. City staff still review every pre-approved ADU for zoning, critical areas, shoreline and other land use rules, in addition to the Building Department’s review.

Plan your Bainbridge Island ADU with a local architect

You might be fitting a pre-approved plan into a flat yard or designing around a wooded shoreline lot. Either way, Bluefoot Architecture & Design can confirm what your parcel allows and design an ADU that fits it. Contact our studio or call 360-602-2965 to start.